American Cranes & Transport - September 2013 - page 4

“Without the Boom Raising System, we would
have been pressed to rent another crane or
wouldn’t have been able to bid on the job.”
Ron Babb — Crane Operator, Reed & Reed Construction
The Boom Raising System for the  USt Manitowoc  Wind Attachment
is designed for customers like Reed & Reed to win more jobs. It allows operators
to raise the longer wind attachment boom lengths needed for  m wind turbine
projects — without an assist crane.
See it in action:
1,2,3 5,6,7,8,9,10,11,12,13,14,...108
Powered by FlippingBook